Wednesday, March 30, 2016
SHOP UPDATE: On light duty but back in the shop
I cut and installed the E brake cables and hooked up the E brake. It took 2 hours to get the Ebrake levers freed up and working in the rear brakes but it works like a champ now.
Her is the transmission tunnel I fabricated all welded and ground.
Here it is installed for a test fit before we Dynamat the cab for noise reduction
Today I installed the radiator support rods and brackets.
Here is the new grill. I fabricated an upper mounting bracket and welded some frame tabs so we could lean the top back a little. I think it looks great.
Labels:
Hot Rods
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment