Monday, November 27, 2017

AFTER HOURS: Spent the day working on the 40 with my dad and brother

 We cut out the original floor to make way for the new floor and trans tunnel.
 Here is DJ cleaning up some edges so we can add some support for the cab floor.
 This is the wood body block that supports the cab under the floor.
 We fabricated and welded in a Brace from the front cab mount to the seat riser. This adds some support through the middle of the door opening. It also gives me a very solid base to attach the new floor to.
 We installed the shifter and mounting brackets so I can fab the trans tunnel  that covers it.
 We also fabricated the boxing plates to fill the gap between the plates the previous owner welded in and got them tacked in place.
We also made the rear shock cross member and installed it

No comments:

Post a Comment