Wednesday, February 24, 2016

SHOP UPDATE: Final assembly on Todd's rat rod

 Those 2 E brake shoes are the hardest brake shoes I have ever changed. What a pain in the ass.
 New shoes, new pads, new rotors. Ready to go.

 All front suspension installed and ready for the road.
 Gas tank and fuel filter installed waiting for plumbing.
 This is the axle truss we built for the four link.

 We decided to try something a little different with the dash. Needed a little style.
 The correct block plate came in so we assembled the engine and trans and installed it in the chassis.


 We put the cab on and test fit the seat for the first time. Should work great.
 Had an ugly hole to fill in the side.
 Susi cut the panel out and prepped the cab for the new patch panel.
 I rolled a new patch through the slip roll and trimmed it to fit and welded it in.

Here it is as of tonight. It goes to the big shop for brakes and fuel system and start the wiring.

No comments:

Post a Comment