I installed the engine and trans in the frame. Assembled the front axle assembly. Assembled the rear axle and attached the rear spring main leaf. I am lenghtening the rear toeque tube tomorrow morning. When the drive shaft comes back from the machine shop I can assemble the rear end and install it. The front spindles are in North Carolina getting bushings and king pins fitted. I should have all the juice brakes ready to install by the time they come back and the chassis is finished.
No comments:
Post a Comment