Here are a few photos of the a pillars. Once I chopped the roof the a paillars no longer lined up. I split the roof above the doors and extended them forward 1 1/4 inches. Now the posts were close but not right. I had to move the bottom of the A piller out and the top inward to get them to line up. Then I had to cut them open to be able to match the size and line up all the body lines. Lots of slice and dice but they are lining up very well. Should finish them up in the morning and start filling in the sections abovethe doors. Stay tuned.
No comments:
Post a Comment