Saturday, August 22, 2015

SHOP UPDATE: Tonight's progress


 Tonight I installed John's B&M deep transmission pan and filter adapter.
 I plumbed the new transmission cooler.
 I drained the rear end and installed the chrome differential cover. I will fill it Monday when I can get the oil.
 Installed the new oil fill tube and breather.
 Installed the custom PCV adaptor. I will finish connecting it when the rest of the parts arrive.
I installed the fuel pump, coil and figured out the lower radiator hose. I ordered some aluminum tubing to bridge the gap. 
Susi almost finished the Dynamat. I will get to start the wiring tomorrow.

No comments:

Post a Comment