I have been working on the rust repair and fabrication of the new floor pan. Both A pillar cab mounts were pretty bad. After removing the rusty metal I made new pieces and welded them in. Then I got back to the floor. All floor panels are cut, I am waiting for the shifter so I can finish the trans tunnel and move on to the rusty cab corners. I also fit the new Glide seat for the first time. Its not a perfect fit but will be when I am done. Thanks for watching
Can't wait to be able to enjoy is.
ReplyDelete